Marketing & Growth

Product Launch Checklist for Dev Tools: Every Step, Phase by Phase

A product launch checklist for developer tools and SaaS, grouped by phase from week −8 to week 4, with an owner and a done-when test for every launch step.

TechLogHub Editorial
November 7, 2026
15 min read
0 views

Share Article

Product launch checklist diagram showing five phases from week minus eight to week four with tick boxes

Product Launch Checklist for Dev Tools: Every Step, Phase by Phase

Quick answer: A usable product launch checklist has five phases: foundations (T−8 to T−5 weeks), assets and technical readiness (T−4 to T−2), a freeze-and-rehearse week, launch day, and four weeks of follow-up. Give every task one owner and a done-when test, cut rows that don't apply, and don't stop at launch day: the post-launch phase is where launch traffic turns into users.

A product launch checklist is only useful if every line has an owner and a clear "done when" test. "Prepare marketing" is a wish; "OG image renders correctly in a Slack and X preview" is a task you can tick off.

This checklist is built for developer tools and small SaaS teams. It runs from eight weeks before launch to four weeks after, grouped by phase, so you can copy it into your issue tracker and treat launch planning like any other project with a deadline. For the strategy behind it (what to launch, which channels, how to size the effort), read our product launch strategy playbook first. This page is the operational side.

How to use this checklist

Work through it in three passes:

  • Cut. Delete rows that don't apply. A CLI tool with no billing doesn't need a payment test. A feature release doesn't need a press list.
  • Assign. Put one name on every remaining row. On a two-person team, that still matters: "both of us" means neither.
  • Date. Turn the relative weeks (T−8, T−4, T−1) into real dates, working backwards from launch day.

Each table below has a "Done when" column. If you can't write a done-when test for a task, it's too vague to be on a launch roadmap. Rewrite it until you can.

Turning rows into tickets

Each row becomes one issue. A consistent format makes the launch board readable at a glance. This is the structure we suggest:

FieldExample
Title[Launch T−3] Open Graph image and tags
OwnerOne person, never a team
Due dateThe real calendar date for T−3 weeks
Done whenImage is at least 1200 × 630 px; preview renders in a link debugger for the landing page and launch post
BlocksLaunch post published; social thread drafted
Labellaunch, plus content or technical

The "Blocks" field is the one teams skip, and the one that matters. Write it, and the critical path shows up on its own: the no-signup demo blocks the Show HN post, the billing test blocks the pricing page, the activation event blocks the week-4 review. Anything that blocks three or more tickets should start this week.

Phase 1: Foundations (T−8 to T−5 weeks)

These are the slow steps to launch a new product. They depend on decisions, not effort, so start them first.

TaskDone when
Write the one-sentence pitch: user, job, differenceThree people outside the team can repeat it back without notes
Decide the launch tier (new product, major feature, minor update)Tier is written in the plan and matches the effort budget
Pick the primary launch date and two or three channelsDate is on the calendar; each channel's rules have been read by the owner
Set up a waitlist or early-access listSignup form works, confirmation email arrives, list is exportable
Define the activation eventOne event (first API call, first project, first deploy) is named and tracked
Recruit 10–20 early usersThey have access and have agreed to give feedback before launch
Start a public changelogAt least two entries are live
Authenticate your sending domainSPF, DKIM and DMARC records pass for the domain your launch emails come from
Publish a privacy policy and termsLinked from the signup form and footer, and they describe what you actually collect

Email authentication is a foundations task because DNS changes and deliverability problems take time to sort out, and your waitlist email is the highest-converting message you'll send on launch day. Google's email sender guidelines have required all senders to Gmail personal accounts to set up SPF or DKIM since February 1, 2024. Senders of more than 5,000 messages a day need SPF, DKIM and DMARC, one-click unsubscribe on marketing messages, and a spam rate in Postmaster Tools below 0.30%. Google recommends staying below 0.10%.

A small waitlist won't hit 5,000 messages a day, but meeting the bulk-sender bar anyway costs little: set up all three records and use a sending service that supports one-click unsubscribe.

Channel rules belong in this phase because they change what you build. Show HN requires something people can try, and treats sign-up and landing pages as off topic. If Hacker News is a primary channel, a no-signup demo becomes a week −8 engineering task, not a week −1 marketing one.

Phase 2: Assets and site readiness (T−4 to T−2 weeks)

This is where most of the product launch process happens. Split it into content and technical work so two people can run in parallel.

Content assets

TaskDone when
Launch post on your own blogCovers problem, solution, pricing and what's next; reviewed by someone outside the team
Quickstart or getting-started docA new user reaches a first result in under five minutes, timed
Screenshots and a short demo video or GIFThree to four screenshots at consistent size; video under 90 seconds
First comment drafted for each channelPlain language, explains why you built it, no ad copy
FAQ section on the landing pageAnswers pricing, data handling, self-hosting and limits
Email to waitlist and existing usersWritten, scheduled, test-sent to yourself

The launch post is the hub. Every channel post, email and social thread links to it, so spend the most editing time here. Run the draft through a heading structure analyzer to catch skipped levels before it goes live.

Technical readiness

TaskDone when
Remove noindex and staging blocks from productionView-source on the live landing page shows no noindex; robots.txt allows public pages
Title and meta description on every launch pageUnique per page; checked with a meta tag generator
Open Graph image and tagsImage is at least 1200 × 630 px; preview renders in a link debugger
Sitemap updated and submittedNew URLs are in the sitemap and it's submitted in Search Console
Analytics events firingSignup and activation events show in your analytics dashboard from a test account
Error monitoring and alertingA test exception reaches the on-call person's phone
Billing tested end to endA real card completes checkout, upgrade, downgrade and cancel
Landing page speed checkedLCP, INP and CLS are in the "good" range on a mobile test
FAQ structured data (optional)Markup matches the visible FAQ; built with an FAQ schema generator
Favicon and app iconsIcon shows in browser tabs and bookmarks; made with a favicon generator
Status page or status channelA public URL where you'll post if something breaks on launch day

Two of these trip teams up often. First, robots.txt won't hide a staging site: Google's robots.txt guide says it "is not a mechanism for keeping a web page out of Google" and recommends noindex or password protection instead. The flip side is that a noindex copied from staging to production will quietly keep your launch page out of search.

Second, social previews. Meta's image guidelines for link shares recommend images of at least 1200 × 630 pixels at roughly a 1.91:1 ratio. Our OG image generator outputs that size. For the sitemap, Google's sitemap documentation calls submission "merely a hint", so submit it, but don't expect it to force indexing on launch day. The sitemap XML generator and robots.txt generator help if you don't have these files yet.

For page speed, web.dev's Web Vitals article sets the "good" thresholds: LCP within 2.5 seconds, INP of 200 milliseconds or less, and CLS of 0.1 or less, measured at the 75th percentile of page loads. A launch page with a heavy hero video often fails LCP on mobile, so test on a throttled phone profile, not just your laptop. (Landing-page design itself is covered in our product launch website guide.)

Changelog format

The changelog you started in phase 1 is linked from the launch post and every follow-up release, so settle its format now. Keep a Changelog is a published convention for this. Its principles include "Changelogs are for humans, not machines," an entry for every version, the latest version first, and a release date on each one. It groups changes as Added, Changed, Deprecated, Removed, Fixed and Security. Adopt it, or something like it, and your week-2 follow-up release is a matter of filling in a section.

Phase 3: Freeze and rehearse (T−7 to T−1 days)

The last week is for removing risk, not adding features.

TaskDone when
Feature freezeOnly launch-blocking bug fixes merge after this date
Load test signup, demo and APIThe paths a launch spike hits handle several times normal traffic without errors
Fresh-eyes onboarding testSomeone who has never seen the product signs up while you watch silently
Schedule the Product Hunt post (if used)Scheduled for 12:01 AM Pacific; maker comment saved
Brief helpersEveryone replying on launch day knows the time, links and tone
Prepare a rollback planYou know how to revert the last deploy in under ten minutes
Send the T−1 email to early usersThey know when and where the launch goes live

Which load test to run

"Load test" covers several different tests. Grafana's guide to load testing types (written for its open-source k6 tool, but the terms are general) separates them. For a launch, three matter:

TestGrafana's definitionLaunch use
Smoke testVerifies "the system functions with minimal load" and gathers baseline valuesRun first, on every launch-critical path, to confirm the test script itself works
Average-load testAssesses performance "under a typical load"Your normal traffic, as the baseline to compare against
Spike testVerifies the system "survives and performs under sudden and massive rushes of utilization"The closest model of a front-page moment: signup, demo and docs under a sudden jump

Our advice: spike-test the paths a visitor hits in their first five minutes (landing page, signup, email confirmation, the demo, the quickstart's first API call) and leave the rest of the app alone. Note the point where errors start, and decide in advance what you'll switch off (a heavy dashboard widget, a live preview) if traffic reaches it.

On timing: Product Hunt's launch guide says the day runs on Pacific time, recommends scheduling for 12:01 AM PT, lets you schedule up to a month ahead, and asks makers to request feedback rather than upvotes.

Phase 4: Launch day

Launch day has few tasks, but they all happen fast. Keep this list on a second screen.

  • Hour 0: Publish the launch post. Post on the primary channel. Add the first comment immediately.
  • Hour 0–1: Send the waitlist email. Post the social thread. Tell early users the link is live.
  • All day: Reply to every comment, ideally within the hour. Critical replies matter most, because quiet readers judge you by them.
  • All day: Watch error rates and signup completion. Ship small fixes and mention them in the thread.
  • End of day: Note every bug, feature request and objection in one document. Thank the people who helped.

Don't post to every community at once. Space secondary channels across days one to three so you can give each thread full attention. Channel-specific rules are in our Product Hunt launch guide and, for running the day as a live event, the virtual product launch guide.

Launch-day roles

Even a two-person team should split the day into roles, written down the day before:

RoleOwnsDoesn't touch
ResponderEvery comment thread, the inbox, social repliesProduction deploys
On-callError alerts, signup funnel, hotfixes, the status pagePublic threads, except to confirm a fix shipped
Lead (often the responder)The go/no-go call, rollback decisions, the end-of-day notesNothing; this person can override either role

Incident rule and message template

Set the rollback threshold before launch so nobody debates it under pressure. One workable rule (ours, adjust it): if signup completion drops below half its rehearsal rate for 15 minutes, roll back first and investigate after. When something breaks, post one short message on the status page and in each active thread:

  • What's broken: "Signup emails are delayed by about ten minutes."
  • Who's affected: "New accounts only; existing users aren't affected."
  • What you're doing: "We've rolled back the last deploy and are watching the queue."
  • When you'll update: "Next update in 30 minutes, or sooner when it's fixed."

Then keep that promise. A thread that sees a clear incident update followed by a fix usually trusts you more than one that saw no problems at all.

Phase 5: Post-launch (week 1 to week 4)

Most launch checklists stop at launch day. That's where the product launch steps that actually create users begin.

WhenTaskDone when
Day 1–3Publish a short product launch post-mortem or "what we learned" updateLive on the blog and shared to the same channels
Week 1Triage all launch feedback into the backlogEvery item is tagged fix, build, decline or investigate
Week 1List the product on discovery platformsListing is live on TechLogHub via submit and other relevant directories
Week 2Ship one visible fix requested at launchChangelog entry plus a post on the releases feed
Week 2Email signups who didn't activateOne plain-text email asking what blocked them
Week 4Review launch metricsActivation rate, week-1 and week-4 retention, and best channel recorded

The week-2 follow-up release is the most skipped item on this list and one of the most valuable. It gives launch visitors a reason to come back and shows them the product is maintained.

The week-2 email to inactive signups

Keep it plain text, from a person, and short enough to answer from a phone. A template:

  • Subject: Quick question about [product]
  • Line 1: "You signed up for [product] last week but haven't [activation event] yet."
  • Line 2: "Was something in the way? A one-line reply is plenty. I read every one."
  • Line 3 (optional): a single link to the quickstart, or to the fix you shipped for the most common launch-day complaint.

Tag each reply with the blocker it names (setup, pricing, missing feature, unclear value) and feed the counts into the week-4 review.

Worked example: a two-person launch plan

Here's a hypothetical plan to show how the phases fit on a real calendar. Two founders, Asha (product and engineering) and Dev (docs, content and community), are launching a self-hosted log viewer. They chose Show HN as primary, with a self-hosting subreddit and their own email list as secondary. Launch day is a Tuesday.

WeekAshaDev
T−8Activation event defined and tracked (first log source connected)Pitch written and tested on three outsiders; channel rules read
T−7Public demo instance with seeded logs, no signupWaitlist form, sending domain authenticated, privacy policy
T−6 to T−5Early-access build to 15 usersChangelog live; early-user feedback collected weekly
T−4 to T−3Billing, analytics, error monitoring, meta and OG tagsLaunch post, quickstart timed at under five minutes, screenshots
T−2Spike test on signup, demo and quickstartFirst comments drafted for each channel; FAQ on landing page
T−1Feature freeze, rollback rehearsal, noindex checkT−1 email to waitlist and early users; roles agreed
Day 0On-callResponder
Week 1–2Fix the top launch bug; tag the releasePost-mortem; listing on submit; inactive-signup email
Week 4Pull the metricsWrite the review and share it with early users

Notice what the example cuts. There's no press list (tier 1, but a niche product), no Product Hunt (the product has little visual UI), and no paid promotion. Cutting rows is part of the checklist, not a failure to complete it.

Week-4 launch review template

Four weeks after launch, write a one-page review. Use the same headings each time so launches can be compared:

SectionWhat to record
NumbersSignups, activation rate, week-1 and week-4 retention for the launch cohort, using the definitions you set in phase 1
ChannelsSignups and activated users per channel, and activation rate per channel
FeedbackTop five requests and top five blockers, with counts from the triage tags
What brokeEvery incident, how long it lasted, and what would have caught it earlier
Checklist changesRows to add, rows to cut, and estimates that were wrong
Next releaseThe tier 2 release this launch's feedback points to, with a date

The "checklist changes" section is how this page becomes your team's own. Copy it forward and edit it after every launch. A diff between two versions of the plan, made with a text diff checker, shows exactly what you learned.

Common checklist failures

FailureHow to catch it
Tasks without ownersNo ticket can be created without a single owner
A staging noindex shipped to productionView-source on launch morning, as a T−0 ticket
Demo gated behind signup when the primary channel requires something people can tryDecide channels in phase 1, so the demo is an engineering task from week −8
Launch emails landing in spamAuthenticate the sending domain in phase 1 and send test emails to Gmail and Outlook addresses
No rollback planRehearse a rollback during freeze week and time it
Stopping at day zeroPut post-launch tickets on the board before launch, with dates

FAQ

What should a product launch checklist include?

It should cover five phases: foundations (positioning, waitlist, activation metric), assets and technical readiness (launch post, docs, meta tags, OG images, analytics, billing), a pre-launch freeze, launch-day tasks and post-launch follow-up. Each task needs an owner and a clear done-when test.

How far in advance should I start launch planning?

About eight weeks for a new product. Positioning, early users and a no-signup demo take the longest. A feature release can compress the plan to two or three weeks, and a minor update needs only a changelog entry.

What are the technical steps to launch a new product website?

Remove any noindex left from staging, give every page a unique title and meta description, add Open Graph tags with a 1200 × 630 image, update and submit the sitemap, confirm analytics and error monitoring work, and test billing end to end.

What time should I launch on Product Hunt?

Product Hunt's day runs on Pacific time, and its launch guide recommends scheduling for 12:01 AM PT. You can schedule up to a month in advance.

Does a small waitlist need SPF, DKIM and DMARC?

Google's sender guidelines require SPF or DKIM for all senders to personal Gmail accounts, and SPF, DKIM and DMARC for senders of more than 5,000 messages a day. A small list is below that bulk threshold, but setting up all three records is cheap and protects the one email you most need delivered on launch day.

What should I do after launch day?

Publish a short post-mortem, triage all feedback, list the product on discovery platforms, ship one visible fix within two weeks, email signups who didn't activate, and review activation and retention after four weeks.


Every row gets an owner, every owner gets a done-when test, and the checklist ends four weeks after launch, not on launch day.

Stay Updated

Get the next deep dive in your inbox

Subscribe for product analysis, engineering explainers, and practical guides published on TechLogHub.

See what launched this week

One email a week: new and trending developer tools, fresh comparisons, and what shipped. Unsubscribe in one click.